Building & Operations

Addition to Technopark Zurich

Client: Technopark Zurich

Our Mission

Technopark Zurich consists of six five-story wings connected by a three-story lobby. An extension was to be built to create additional office space that would accommodate the various tenant needs thanks to a maximally flexible room layout.

Approach

The two-story extension above the Wandelhalle was realized as a steel and reinforced concrete structure while the Technopark remained in operation. The building envelope was constructed in accordance with the Minergie standard. In order to ensure the spatial flexibility of use, various static and technical building adjustments had to be made to the existing building.

Services of pom+Consulting AG

  • Project management for the client (SIA phases 3 to 5)
  • Execution of TU-Submission
  • Preparation of project reporting / status reports
  • Cost and schedule controlling
  • Management of client and project committee meetings
  • Participation in planner and operations meetings to maintain operations
  • Change and supplement management
  • Coordination of tenant improvements, support of negotiations with tenants
  • Construction site controls, ensuring execution quality incl. acceptance management

Challenges

  • Construction during ongoing operations
  • Ensuring spatial flexibility of use 
  • Addition of new storeys to existing buildings
  • Achieving a sustainability label

Your contact persons

Martin Cremosnik

Partner

Dipl. Ing. ETH, dipl. Wirtschaftsing. FH

EFQM Coach

Location Zurich

Michel van Mark

Head of Service Unit

MBA HSG

Location Lausanne